Pottersburg Sanitary Trunk Sewer Environmental Assessment
Image
Image
The official website for the City of London, Ontario
The existing Pottersburg Creek Trunk Sanitary Sewer crosses the Pottersburg Creek several times at a shallow depth with segments of the sewer in poor condition. Additionally, portions of the existing Pottersburg Creek Trunk Sanitary Sewer are located on private property, limiting access to the sewer. The existing sewer is in need of rehabilitation or replacement, however, due to its alignment, localized rehabilitation is challenging. Subsequently, the City has retained GM Blueplan Engineering Ltd., as the Consultant to carry out a Schedule ‘B’ Municipal Class Environmental Assessment (EA) study to identify the preferred Pottersburg Creek Trunk Sanitary Sewer Realignment.
learn more about the project and read the final project file
The Study has been completed, and a Notice of Study Completion has been sent out to the Study Area, Stakeholders, and neighbouring First Nations Communities. A 30-day public review period from July 23rd, 2021 to August 23, 2021 is underway.
Alternatively, a printed copy is available to interested parties at City Hall (300 Dufferin Avenue, 3rd floor), and the local Public Library (London East, 2016 Dundas Street), to be read at these locations.
If you have any questions or comments around the Pottersburg Creek Trunk Sanitary Sewer EA, please contact Alex Corpodean by e-mail at acorpodean@london.ca or by phone at 519-661-2489 x 8437.
This study area for this project is within the Argyle neighbourhood in the City of London, north of Dundas Street between First Street and Clarke Road. This Sanitary Trunk Sewer will be constructed over a number of years, with a number of phases which will be identified further along in the detailed design process.
A map of the Pottersburg Creek Truck Sanitary Sewer Environmental Assessment Area.
If you require documents in an alternate format or have questions about this project, please contact Alex Corpodean, C. Tech, PACP at acorpodean@london.ca or by phone at 519-661-2489 x 8437.
With the exception of personal information, all comments will become part of the public record of the study.
The study is being conducted according to the requirements of the Municipal Class Environmental Assessment, which is a planning process approved under Ontario’s Environmental Assessment Act.
A Notice of Commencement was completed and issued in January 2020.
The Project Information Centre for the Pottersburg Environmental Assessment is ongoing. To view the Project Information Centre, please go to getinvolved,london.ca/pottersburgea
If you have any questions or comments, please contact the Project Manager, Alex Corpodean, C. Tech, PACP at acorpodean@london.ca or by phone at 519-661-2489 x 8437.
A Civic Works Committee Report to Council is being planned recommending the findings of the Environmental Assessment.
The final study document would be prepared in July 2021 and posted for a 30-day public review and comment period.
The final study document will be finalized, and any comments received during the 30-day review period will be addressed, and incorporated into the final Project File.